Step 6 - Top Coat
The final step is the top coat.
A high build water-based system, tailored to your chosen colour, is used to prevent running/sagging during application
The first coat is then applied and left to dry for 2 hours. A second coat is then applied, which gives the best coverage, durability and weather protection to keep your roof looking brand new for longer.